06.06.2025

The stages of drilling a well

Drilling the soil makes it possible to create a well that allows the earth to extract the necessary valuable natural resources. But such drilling is impossible without special equipment and without specially trained people who are familiar with both safety regulations and how to do this job correctly. Special workers always carry out this work in a variety of areas. Thus, they drill wells in a soil or mountain layer either vertically, horizontally, or in an inclined manner.

As a result of such drilling, a well appears in the soil, which is a kind of cylindrical void, and the diameter of such a well can be completely different, since everything depends on what such a well is intended for, as well as on what equipment was used to drill it. By the way, all information about drilling a well on the site can always be found freely available. The beginning of a well will always be at the top of the soil, and the bottom of such a well is called a bottom. In addition, specialists call the walls of such a well in a special way — a bore. To make such wells, either medium-sized special equipment or a light type of such equipment is used. But it is also rare that it is also necessary to use heavy equipment to drill a well.

The process of drilling a well is divided into several stages. First of all, the first stage involves transporting equipment to the site where such drilling will take place. The second stage is the direct drilling of the mine. This stage is divided into several processes, which include deepening the trunk, where regular washing will take place, as well as the destruction of any rocks. To prevent this very trunk from collapsing, it must be strengthened. To do this, a column is also made in space, which is connected to each other by pipes. The connection between the rock and the pipe takes place using a cement solution called plugging. The last stage of drilling a well is the development of a well that makes it possible to open the very last layer of rock found, and then a zone is formed that allows the liquid to flow out.

Contact Us

Submit a request, and our manager will contact you for a consultation and cost estimate. We work across Kazakhstan with both private and government contracts.

Thank you! We will contact you shortly
Something went wrong. Please try submitting your request again later